What is BIM (Building Information Modeling)? Meaning, Example and How It Works

By , Founder of ZYSNOR · Updated · Checked · 5 min read

In simple words

Building Information Modeling (BIM) is a way of designing, building and running a building with one shared digital model. The model holds the 3D shape and the information about every element, such as type, material, size and cost. Architects, engineers, contractors, quantity surveyors and building owners use BIM, each for their own part of the work.

The international standard for managing that information over the whole life of an asset is ISO 19650.

Why it matters

With BIM every team works from the same data, so clashes are found on screen before they are built, and drawings, schedules and quantities stay in step when the design changes. The information is then handed over to run and maintain the building.

How it works

Each discipline (architecture, structure, MEP) builds its own model of real elements, such as walls, beams and ducts, each carrying data. The models are shared through a common data environment (CDE), combined for coordination and checked for clashes. Drawings, schedules and quantities are views of the same data, so a change is made once and shows up everywhere. At handover, the information is passed on to run and maintain the building.

The information states in a CDE

Four states: work in progress, shared, published and archive
Information is checked before it is shared and authorised before it is published.
  • Work in progress: a task team is still working; others do not use it.
  • Shared: checked and made available to other teams for coordination.
  • Published: authorised for use, for example for construction.
  • Archive: kept as the record of what was shared and published.

Key terms in ISO 19650

The appointing party (client) states what information it needs: organisational, asset and project information requirements (OIR, AIR, PIR) and exchange information requirements (EIR). The delivery team produces the project information model (PIM) during design and construction, and the asset information model (AIM) is kept for operation. Open formats such as IFC let models move between different software.

Table of the six parts of ISO 19650 from 2018 to 2025
Six parts, from concepts and principles (2018) to health and safety information (2025).

Worked example: one change, every view updates

In a Revit model a run of walls 25.00 m long is changed from 3.00 m to 3.20 m high.

Bar chart: wall area 75.00 m² at 3.00 m, 80.00 m² at 3.20 m, change 5.00 m²
The wall schedule updates by itself: 0.20 m × 25.00 m = 5.00 m².
  • Area before: 25.00 × 3.00 = 75.00 m²
  • Area after: 25.00 × 3.20 = 80.00 m²
  • Change: 80.00 − 75.00 = 5.00 m², the same as 0.20 × 25.00

The plans, sections and the wall schedule change at the same moment. In a drawing-only workflow, each of these would be edited by hand, with the risk that one is missed.

Types of BIM use

  • Design coordination and clash detection before construction.
  • Quantities and cost estimates taken from the model (often called 5D).
  • Construction sequencing linked to the programme (often called 4D).
  • Asset information for facility management after handover.

Step by step: starting BIM on a project

  1. Agree the client's information requirements and the exchange requirements.
  2. Write a BIM execution plan: who models what, to which level of detail, in which software and format.
  3. Set up the CDE, naming rules, shared coordinates and levels.
  4. Model, share and coordinate in planned cycles, with clash checks.
  5. Publish approved information and hand over the asset information model.

Common mistakes

  • Treating BIM as 3D drawing only, with little or no reliable data in the elements.
  • No agreed naming, coordinates or level of development between teams.
  • Models modelled to look right but not built from real element types (a floor drawn as a wall).
  • Using shared information as if it were published and approved.
  • Leaving information requirements until handover, when the data is hardest to collect.

Related terms

Frequently asked questions

Is BIM a software?

No. BIM is a process; software such as Revit is used to make and manage the model.

What is ISO 19650?

The international standard series for managing information on built assets using BIM.

What is a common data environment (CDE)?

The shared place where project information is stored and exchanged. Information moves through work in progress, shared, published and archive states.